Northampton County
stocking information.
20 named waters linked here. Match the managed section as well as the water name before planning your trip.
This page reflects our imported source snapshot. It is not a complete survey of all waters in Northampton County. Exact access points and current fishing rules must be checked with the agency.
Minsi LakeBushkill Creek (section 5)Bushkill Creek (section 7)Little Bushkill Creek (section 4)Hokendauqua Creek (section 4)Hokendauqua Creek (section 5)Bushkill Creek (section 2)Little Bushkill Creek (section 2)Jacoby Creek (section 2)Martins Creek (section 1)Lehigh Canal (section 5)Martins Creek (section 3)Monocacy Creek (section 3)Monocacy Creek (section 5)Monocacy Creek (section 9)Saucon Creek (section 4)Hokendauqua Creek (section 2)Indian Creek (section 2)Lehigh Canal (section 8)Monocacy Creek (section 8)
Dates & reported stockings.
| Water & location | Date | Status | Species | Source |
|---|---|---|---|---|
| Minsi LakeNorthampton County | Oct 6, 2026Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Bushkill Creek (section 5)Northampton County | Apr 27, 2026Section limits: PVT BRDG OFF BUSKILL DR (SR2019) to 0.1 MILE UPSTM EDGEWOOD AVE BDG (ORIGINALLY BINNEY-SMITH DAM). Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brook Trout, Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Bushkill Creek (section 7)Northampton County | Apr 27, 2026Section limits: 13TH STREET BDG to CONFL W/DELAWARE R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Little Bushkill Creek (section 4)Northampton County | Apr 27, 2026Section limits: 0.34 miles downstream Engles Rd bridge (T-623) to Confluence with Bushkill Creek. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Minsi LakeNorthampton County | Apr 25, 2026Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Hokendauqua Creek (section 4)Northampton County | Apr 24, 2026Section limits: 0.5 MILES UPSTREAM KREIDERSVILLE COVERED BRDG to SR0329 (PA RT 329) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Hokendauqua Creek (section 5)Northampton County | Apr 24, 2026Section limits: SR0329 (PA RT 329) BRDG to CONF W/ LEHIGH R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Bushkill Creek (section 2)Northampton County | Apr 20, 2026Section limits: BUSHKILL CTR RD (SR4025) BDG - COPELLA to FILETOWN RD (SR1006) BDG - BELFAST JCT. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Bushkill Creek (section 5)Northampton County | Apr 20, 2026Section limits: PVT BRDG OFF BUSKILL DR (SR2019) to 0.1 MILE UPSTM EDGEWOOD AVE BDG (ORIGINALLY BINNEY-SMITH DAM). Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brook Trout, Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Bushkill Creek (section 7)Northampton County | Apr 20, 2026Section limits: 13TH STREET BDG to CONFL W/DELAWARE R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Little Bushkill Creek (section 2)Northampton County | Apr 20, 2026Section limits: DELABOLE RD (SR1016) BRDG to JONES HILL RD (T-609) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Jacoby Creek (section 2)Northampton County | Apr 16, 2026Section limits: SAND PT RD (T-728) BDG to CONFL W/DELAWARE R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Martins Creek (section 1)Northampton County | Apr 16, 2026Section limits: CONFLUENCE E & W BR MARTINS CK to DISCHARGE BANGOR SEWAGE TRT PLANT NEAR UNM TRIB. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Lehigh Canal (section 5)Northampton County | Apr 15, 2026Section limits: 1.0KM DNST CARBON CO. LINE to CONF. W BERTSCH CK. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Martins Creek (section 3)Northampton County | Week of Apr 13, 2026Week of · exact day and end date not suppliedSection limits: WALTZ CK CONFL to DAM 0.6KM UPS INT S.MAIN ST (SR1015)&OLD FRANKLIN. Agency provides a week-of date without an end date. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 3)Northampton County | Apr 13, 2026Section limits: SR0248 (PA RT 248) BDG to SR0512 (PA RT 512) BDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 5)Northampton County | Apr 13, 2026Section limits: 0.3KM UPS GEORGETOWN RD (T-436) BRIDGE to 100M BELOW US22 BRIDGE AT PA19. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 9)Northampton County | Apr 13, 2026Section limits: SCHOENERSVILLE RD (SR3017) BRDG to CONF W/LEHIGH R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Saucon Creek (section 4)Northampton County | Apr 13, 2026Section limits: 2ND RXR BRDG UPS NEAR BINGEN to 0.61KM (0.38MI) UPS HIGH ST/SEIDERSVILLE ROAD BRG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Hokendauqua Creek (section 2)Northampton County | Apr 9, 2026Section limits: ENT BRDG TO PT PHILIPS R&G to 0.38 M DWS CHURCH RD (T-477) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Hokendauqua Creek (section 4)Northampton County | Apr 9, 2026Section limits: 0.5 MILES UPSTREAM KREIDERSVILLE COVERED BRDG to SR0329 (PA RT 329) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Hokendauqua Creek (section 5)Northampton County | Apr 9, 2026Section limits: SR0329 (PA RT 329) BRDG to CONF W/ LEHIGH R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Indian Creek (section 2)Northampton County | Apr 9, 2026Section limits: 0.71 KM (0.44 MI) DWSTRM CEDAR DR (T-511) BRDG to INDIAN TRAIL RD (SR3016) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Lehigh Canal (section 8)Northampton County | Apr 7, 2026Section limits: 1ST LOCK UPSTRM MONOCACY CK CROSSING to NANCY RN CROSSING. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 3)Northampton County | Apr 6, 2026Section limits: SR0248 (PA RT 248) BDG to SR0512 (PA RT 512) BDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 5)Northampton County | Apr 6, 2026Section limits: 0.3KM UPS GEORGETOWN RD (T-436) BRIDGE to 100M BELOW US22 BRIDGE AT PA19. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 8)Northampton County | Apr 6, 2026Section limits: ILLICKS MILL DAM to SCHOENERSVILLE RD (SR3017) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Saucon Creek (section 4)Northampton County | Apr 6, 2026Section limits: 2ND RXR BRDG UPS NEAR BINGEN to 0.61KM (0.38MI) UPS HIGH ST/SEIDERSVILLE ROAD BRG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Lehigh Canal (section 8)Northampton County | Mar 26, 2026Section limits: 1ST LOCK UPSTRM MONOCACY CK CROSSING to NANCY RN CROSSING. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Jacoby Creek (section 2)Northampton County | Mar 25, 2026Section limits: SAND PT RD (T-728) BDG to CONFL W/DELAWARE R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Martins Creek (section 1)Northampton County | Mar 25, 2026Section limits: CONFLUENCE E & W BR MARTINS CK to DISCHARGE BANGOR SEWAGE TRT PLANT NEAR UNM TRIB. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Martins Creek (section 3)Northampton County | Mar 25, 2026Section limits: WALTZ CK CONFL to DAM 0.6KM UPS INT S.MAIN ST (SR1015)&OLD FRANKLIN. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Lehigh Canal (section 5)Northampton County | Mar 23, 2026Section limits: 1.0KM DNST CARBON CO. LINE to CONF. W BERTSCH CK. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Bushkill Creek (section 2)Northampton County | Mar 14, 2026Section limits: BUSHKILL CTR RD (SR4025) BDG - COPELLA to FILETOWN RD (SR1006) BDG - BELFAST JCT. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Bushkill Creek (section 5)Northampton County | Mar 14, 2026Section limits: PVT BRDG OFF BUSKILL DR (SR2019) to 0.1 MILE UPSTM EDGEWOOD AVE BDG (ORIGINALLY BINNEY-SMITH DAM). Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brook Trout, Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Bushkill Creek (section 7)Northampton County | Mar 14, 2026Section limits: 13TH STREET BDG to CONFL W/DELAWARE R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Minsi LakeNorthampton County | Mar 4, 2026Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Hokendauqua Creek (section 2)Northampton County | Feb 28, 2026Section limits: ENT BRDG TO PT PHILIPS R&G to 0.38 M DWS CHURCH RD (T-477) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brook Trout, Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Hokendauqua Creek (section 4)Northampton County | Feb 28, 2026Section limits: 0.5 MILES UPSTREAM KREIDERSVILLE COVERED BRDG to SR0329 (PA RT 329) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brook Trout, Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Hokendauqua Creek (section 5)Northampton County | Feb 28, 2026Section limits: SR0329 (PA RT 329) BRDG to CONF W/ LEHIGH R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brook Trout, Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Indian Creek (section 2)Northampton County | Feb 28, 2026Section limits: 0.71 KM (0.44 MI) DWSTRM CEDAR DR (T-511) BRDG to INDIAN TRAIL RD (SR3016) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brook Trout, Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Saucon Creek (section 4)Northampton County | Feb 27, 2026Section limits: 2ND RXR BRDG UPS NEAR BINGEN to 0.61KM (0.38MI) UPS HIGH ST/SEIDERSVILLE ROAD BRG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 3)Northampton County | Feb 25, 2026Section limits: SR0248 (PA RT 248) BDG to SR0512 (PA RT 512) BDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 5)Northampton County | Feb 25, 2026Section limits: 0.3KM UPS GEORGETOWN RD (T-436) BRIDGE to 100M BELOW US22 BRIDGE AT PA19. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 8)Northampton County | Feb 25, 2026Section limits: ILLICKS MILL DAM to SCHOENERSVILLE RD (SR3017) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Monocacy Creek (section 9)Northampton County | Feb 25, 2026Section limits: SCHOENERSVILLE RD (SR3017) BRDG to CONF W/LEHIGH R. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Little Bushkill Creek (section 2)Northampton County | Feb 23, 2026Section limits: DELABOLE RD (SR1016) BRDG to JONES HILL RD (T-609) BRDG. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |
| Little Bushkill Creek (section 4)Northampton County | Feb 23, 2026Section limits: 0.34 miles downstream Engles Rd bridge (T-623) to Confluence with Bushkill Creek. Planned; completion not established. | Assumed stockedScheduled date has passed with no postponement or cancellation listed; not confirmed by a stocking report. | Brown Trout, Rainbow Trout | PFBC Checked Nov 18, 2026 |